MISSION
The primary goal of the project was to revitalize the outdated switchboard at GCP Applied Technologies. This upgrade aimed not only to enhance electrical capacity but also to ensure a reliable power supply essential for their operations. Additionally, the project focused on improving safety and compliance with current electrical standards, specifically AS/NZS 3000.
Services
For this project, we delivered a comprehensive suite of services, ensuring a seamless and efficient upgrade to the new switchboard. Our team prioritised safety, reliability, and minimal disruption to operations.
Assessment & Design: Conducted a detailed evaluation and developed an innovative switchboard design.
Installation: Executed the installation with precision, adhering to strict safety and efficiency standards.
System Testing: Performed thorough testing to guarantee reliable performance.
Integration: Seamlessly integrated the upgraded switchboard with existing electrical systems.
Minimized Disruption: Completed all work outside of GCP's operating hours to ensure uninterrupted operations.
Impact
The project brought substantial benefits to GCP Applied Technologies, markedly reducing the chances of electrical failures and optimizing overall operational reliability. The upgraded electrical infrastructure promotes a safer working environment and facilitates the smooth execution of daily activities, ultimately contributing to increased productivity and operational excellence.
Outcome
The upgrade resulted in a cutting-edge switchboard that significantly improved both electrical capacity and system reliability for GCP Applied Technologies. This new installation effectively meets current demands and anticipates future needs, enhancing operational efficiency while ensuring compliance with safety regulations and significantly reducing the risk of electrical outages.
THE CHALLENGE
Before the upgrade, GCP Applied Technologies faced a pressing challenge with an outdated switchboard that was inadequate for their growing electrical demands. This situation risked potential downtime, operational inefficiencies, and safety hazards, making an urgent upgrade necessary to support continued success and reliability in their operations.
PROCESS
The project progressed through clearly defined phases. We began with a detailed assessment of the current electrical system, leading to the precise design of an upgraded switchboard solution. During the implementation phase, the new switchboard was expertly installed, followed by comprehensive testing to ensure reliability and compliance with safety standards. This careful process culminated in the successful integration of the upgraded system with GCP’s existing electrical infrastructure.
Findings
During the project, we identified several critical insights that enhanced our approach. Notably, we discovered that the outdated switchboard not only hindered electrical capacity but also posed safety risks due to aging components. Additionally, the initial assessment revealed inefficiencies in the existing wiring layout, which could lead to potential overloads in the future. These findings guided us in tailoring the upgrade to not only meet current demands but also accommodate future growth, ensuring a robust and efficient electrical solution for GCP Applied Technologies.
Results
The project delivered significant measurable outcomes for GCP Applied Technologies. The newly installed switchboard increased electrical capacity by 30%, allowing for greater power distribution across their operations. Additionally, system reliability improved, resulting in a 40% reduction in unplanned outages, which enhanced overall operational efficiency. The project also ensured compliance with safety standards, mitigating risks and promoting a safer working environment. These results underscore the effectiveness of the upgrade, aligning perfectly with GCP's commitment to excellence and operational integrity.
Client Background
GCP Applied Technologies is a recognised leader in the building materials and construction industry, known for delivering innovative solutions and high-quality products. The company operates in a demanding environment, relying on robust and reliable electrical systems to ensure operational efficiency and safety across their manufacturing and distribution facilities.
TIMELINE
The project was meticulously planned over the course of one day, allowing for seamless execution. The entire upgrade was successfully completed in a single overnight session, conducted outside of GCP Applied Technologies' operating hours. This strategic approach not only ensured minimal disruption to their normal operations but also enabled them to continue business without interruption the following day.


Our Workmanship Speaks for Itself.
-
I've had Nick do all my electrical work for the last 3 years - many different projects - he always turns up on time and completes all works spot on and cleanly - provides good old fashioned service and knows exactly what he’s doing.
Paul Gravina
-
Engaged Tassi to do some domestic electrical work. They responded straight away, quoted and completed the work, all at a reasonable rate. I would recommend them to anybody.
Nigel Groome
-
Nick and his team are always professional, on time and very reasonably priced. Nick was outstanding in helping me with my build. Always checking in and accomodating to my very need. Highly recommend!
Rhiannon Maroun
Let’s Work Together.
Partner with Tassi Electrical Solutions for all your commercial & industrial power and lighting needs. Whether you’re planning a new installation or looking to upgrade existing systems, our team is here to help your business shine. Contact us today to discuss your project and discover how we can support your business with safe, efficient, and stunning electrical solutions.